Demolition debris dumpster rental in Gainesville, GA: a 30 yard roll-off on timber mats beside a detached garage coming down on a Hall County lot, framing, siding, roof decking and broken slab separated into loads.

Demolition

Demolition Debris Dumpster Rental in Gainesville, GA

Garages, outbuildings, interior strip-outs, decks, additions and whole small structures. In Georgia the survey and the notice come before the machine does, and the permit desk depends on which side of the city limit line you are on.

Fully InsuredFull commercial coverage on every load we haul
Same-Day DeliveryCall before nine and we can usually make it today
Flat-Rate PricingOne number covering delivery, pickup and disposal
Locally OwnedGainesville based since 2013 — not a call center

Demolition is the job where the paperwork genuinely comes first, and in Georgia the sequence is unusually clear. Before a structure comes down, Georgia EPD wants to know about asbestos. Under Ga. Comp. R. & Regs. Chapter 391-3-14, an agent of a Georgia-licensed abatement contractor has to inspect for regulated asbestos-containing material prior to renovation or demolition, and notification is required for all demolition projects, with an exception only for residential structures of four or fewer dwelling units that are not part of a larger project. The notice period is ten working days, Monday through Friday, and the postmark counts as the first of the ten. The fee is $0.10 per square foot plus $0.10 per linear foot of friable material, with a $25 minimum and caps of $50 for residential and small projects and $1,000 for others. The EPD duty officer takes questions on (404) 363-7026.

Then the permit, and which desk you call depends entirely on the address. Inside the City of Gainesville, demolition permits come through Building Inspection at 311 Henry Ward Way on (770) 531-6570 — and if the property is in a city historic preservation overlay, a Certificate of Appropriateness comes first, because demolition and relocation are expressly among the exterior changes a COA covers. In unincorporated Hall County, demolition permits come from Hall County Building Inspections at 2875 Browns Bridge Road on (770) 297-2650. The county is unusually helpful about the boundary: it states plainly that it handles permits for unincorporated Hall County only, and that properties inside the city limits of Braselton, Buford, Clermont, Flowery Branch, Gainesville, Gillsville, Lula or Oakwood must apply through their own municipal permitting departments.

If the scope involves any ground disturbance — pulling a slab, taking out footings, removing stumps, backfilling a basement or a pool — that is a locate request before anything moves. In Georgia the one-call center is Georgia 811, operating under the Georgia Underground Facility Protection Act at O.C.G.A. Title 25, Chapter 9. The statutory notice window is not less than two and not more than eight business days before excavation, and the clock starts at 7 a.m. on the first business day following the request. That upper bound is the part contractors forget: on a tight demolition schedule, eight business days is a real number, and a machine standing idle because the locates are not back is an expensive way to learn it. File early and build it into the program.

Where the debris goes depends on what it is, because Georgia recognizes three landfill classes and demolition produces material for all three. Construction and demolition waste — the framing, sheathing, siding, roofing, drywall, doors and windows — is defined in the state rules as waste building materials and rubble resulting from construction, remodeling, repair and demolition operations, and it routes to a C&D facility under 391-3-4-.07(4)(b) or to a municipal landfill. Clean concrete, block, brick, rock and cured asphalt route to an inert facility under 391-3-4-.07(4)(c) — and they have to, because the Hall County landfill will not accept bulk concrete or asphalt. Cleared brush, stumps and limbs are a third stream again. Sorting at the container is what keeps a demolition job from getting expensive at the gate.

One thing you cannot do with a demolition pile in Hall County is burn it. The county prohibits burning building materials, furniture, plastic, rubber, tires and garbage at any time of year, full stop. On top of that, Georgia EPD runs a summer open burn ban from 1 May through 30 September under Ga. Comp. R. & Regs. 391-3-1-.02(5), covering 54 counties including Hall, so between those dates there is no outdoor burning at all. Even in the open season from October through April the county allows only natural fallen leaves and small limbs from your own property, in a pile no larger than six feet by six feet, fifty feet from structures and property lines, with an adult present and the fire out before dark, under a permit from the Hall County Fire Marshal. For a demolition pile, the container is the legal route. Call (470) 691-8287.

Demolition Work We Set Containers For

Detached Garages And Outbuildings

Framing, siding, roof covering, decking and the slab underneath. Two loads really: the structure in a 30, and the broken concrete in a small container loaded flat and kept clean.

Interior Strip-Outs

Everything down to the studs — drywall, plaster, ceilings, flooring, cabinetry, trim and old wiring. In a pre-1978 building this is where the lead and asbestos questions actually land.

Deck, Porch And Carport Removal

Pressure-treated framing, decking, rail, lattice, posts and the footings that come out with them. Bulky above ground and heavy below it, so split the concrete out of the load.

Chimney And Masonry Removal

Brick, block, mortar and flue tile. Dense, dirty, and a classic 10 yard load — it will reach a lawful payload while the sides are still plainly visible, which is the box working correctly.

Additions And Bump-Out Removal

The old exterior wall, roof tie-in, siding, sheathing and the slab or piers. Structural work, which means a permit and, on anything but a small residential structure, an asbestos notification first.

Mobile Home And Outbuilding Sites

Skirting, decking, steps, piers and the debris left behind on a site. Note that mobile homes themselves are prohibited at both the county landfill and the compactor sites, so ask before anything gets loaded.

Fire And Water Damage Strip-Outs

Charred framing, soaked drywall, insulation and flooring. Wet material is far heavier than it looks, so the container sizes down and gets collected sooner rather than standing open.

Pool And Patio Demolition

Broken shell, coping, deck slab and the spoil from the backfill. Ground disturbance means a Georgia 811 locate request first, and the masonry goes as its own clean load.

Sizing A Demolition Job

Demolition is the job most likely to need two containers rather than one big one, and that is a saving rather than a cost. Structural debris — framing, sheathing, siding, roofing, drywall — is bulky, so a 30 yard is the working default and a 40 makes sense when the material is genuinely airy and the site has room for the truck to line up straight. Masonry is the opposite: broken slab, block, brick, mortar and chimney rubble belong in a 10 or a 15 loaded flat, both because they reach a lawful payload early and because a clean inert load can be routed somewhere a mixed load cannot. Cleared brush and stumps are a third load again. If everything goes in one box, the whole thing travels as mixed waste and you pay for that at the gate. Dimensions are on the container sizes page and our Georgia C&D guide covers the sorting in detail.

Sequence, Access And What Not To Assume

The sequence that keeps a demolition job clean is survey, notice, permit, locates, then machine. The RACM inspection comes before anything is disturbed; the ten working days’ notice to EPD runs on working days and the postmark starts it; the demolition permit comes from the city on (770) 531-6570 or the county on (770) 297-2650 depending on the address, with a Certificate of Appropriateness first in a city historic district; and a Georgia 811 locate request needs two to eight business days with the clock starting at 7 a.m. the next business day. None of that is our department, but all of it decides when the container is useful. On site, the usual applies: about 60 feet of straight approach, ten and a half feet of working width, 20 feet of overhead clearance, mats under the rails on red clay, and a container kept five feet clear of combustible walls, openings and roof eave lines under the 2024 International Fire Code § 304.3.4. One thing not to assume: that a load can go anywhere. Georgia’s permit by rule at 391-3-4-.06 requires waste to be deposited only at permitted facilities, and the Hall County landfill will not take bulk concrete or asphalt at all.

Not sure this is the right service? Describe the job on the phone and we will point you at the right container even if it is a different service page. Call (470) 691-8287.

How it works

Demolition Debris Removal in four steps

  1. 1

    Call us

    Tell us the project, your address and when you want it. Two minutes on the phone and you have a flat price.

  2. 2

    We deliver

    Our driver walks the drop, lays protection boards and sets the container exactly where you want it.

  3. 3

    You load it

    Take your time within your rental window. Keep it level with the top rail and we handle the rest.

  4. 4

    We haul it

    Call or text when you are done. We pull it, sort what can be recovered and dispose of the rest properly.

Demolition Debris Removal FAQs

Do we need an asbestos survey on a house demolition?

Georgia EPD requires that an agent of a Georgia-licensed abatement contractor inspect for regulated asbestos-containing material prior to renovation or demolition, and requires notification for all demolition projects — with an exception only for residential structures of four or fewer dwelling units that are not part of a larger project. So a single-family house on its own generally falls inside that exception for the notification, and a commercial building, an apartment block or a house that is part of a larger project does not. The survey question is one to put directly to EPD on (404) 363-7026 for your specific structure rather than to us. Notice, where required, is ten working days with the postmark counting as day one.

Who issues the demolition permit?

It depends on the address, and the county is explicit about the line. Inside the City of Gainesville, it is Building Inspection at 311 Henry Ward Way on (770) 531-6570, and in a city historic preservation overlay a Certificate of Appropriateness is required first because demolition and relocation are among the exterior changes it covers. In unincorporated Hall County, it is Hall County Building Inspections at 2875 Browns Bridge Road on (770) 297-2650 — and the county states that it permits for unincorporated Hall only, directing properties inside Braselton, Buford, Clermont, Flowery Branch, Gainesville, Gillsville, Lula and Oakwood to their own municipal desks.

Can we burn the pile instead?

No. Hall County prohibits burning building materials, furniture, plastic, rubber, tires and garbage at any time of year. Separately, Georgia EPD operates a summer open burn ban from 1 May through 30 September under Ga. Comp. R. & Regs. 391-3-1-.02(5) covering 54 counties including Hall, during which there is no outdoor burning at all. Between 1 October and 30 April the county allows only natural fallen leaves and small limbs from your own property, in a pile no larger than six feet by six feet, fifty feet from structures and property lines, adult supervised, out before dark, and under a Fire Marshal permit. A demolition pile is not on that list under any circumstances.

Can we put the concrete in with the rest of it?

You can, but it will cost you more than splitting it. Georgia treats a clean load of concrete, block, brick, rock and cured asphalt as inert material that can go to an inert waste landfill under 391-3-4-.07(4)(c). Mixed into a load of framing and drywall, it is no longer a clean load and it loses that route entirely. On top of that, the Hall County landfill specifically will not accept bulk concrete or asphalt, so the mixed load has fewer destinations, not more. Practically: one small container for masonry, loaded flat and kept clean, and one bigger container for the structure.

How soon can the container be there?

Usually quickly — call before nine and same day is often possible in Hall County. The more useful question on a demolition is when it should be there, because a container standing on site for two weeks while you wait on a survey, a notice period or a set of locates is money doing nothing. Georgia 811 alone can take up to eight business days. Tell us your permit and locate dates when you book and we will schedule delivery against those, then plan swaps around the demolition sequence rather than dropping everything on day one. Call the yard on (470) 691-8287.

Where we deliver

Demolition Debris Removal across Hall County and North Georgia

Same service, same flat rates, every town below. Pick yours for local placement and permit notes.

Talk to a real person

Need demolition debris removal in Gainesville?

Tell us what you are clearing out and we will tell you the right size and the flat price to put it in your driveway. No forms, no waiting on an email — just call and we will sort it out in a couple of minutes.

Serving Gainesville, Hall County and North Georgia · Mon–Fri 6:30am–5pm, Sat 7am–1pm

(470) 691-8287 Free quote · no obligation
Call (470) 691-8287Free quote · same-day delivery